- 3 E-2D Advanced Hawkeye aircraft;
- 10 T-56-427A engines (6 installed and 4 spares);
- 3 AN/APY-9 radar assemblies;
- 4 AN/ALQ-217 electronic support measure systems (3 installed and 1 spare);
- 3 AN/AYK-27 Integrated Navigation Channels and Display Systems;
- 5 Link-16 (MIDS-JTRS) Communications Systems (3 installed and 2 spares);
- 10 Embedded GPS/INS (EGI) Devices (6 installed and 4 spares);
- 4 AN/APX-122(A) and AN/APX-123(A) Identification, Friend or Foe systems (3 installed and 1 spare);
- 1 Joint Mission Planning System.
Also included are Common Systems Integration Laboratories with/Test Equipment, one in Melbourne, Florida, and the other in France; air and ground crew equipment; support equipment; spare and repair parts; publications and technical documentation; transportation; training and training equipment; U.S. Government and contractor logistics, engineering, and technical support services; and other related elements of logistics and program support.
Total program cost $2 billion
프로그램 코스트가 대략...... 이런 구성인듯
또, 부품은... 생각보다 스페어로 챙기는게 많음